Groundworks and civil engineering in Hertfordshire.

Substructure packages across Hertfordshire, from Watford and Rickmansworth out to St Albans and Hemel.

Straight up the A41 and we are on your site.
Hertfordshire · commercial substructure
Reef in Hertfordshire

Straight up the A41 and we are on your site.

Rickmansworth and Watford are a short run from Hillingdon, and St Albans, Hemel Hempstead and the A1(M) corridor are all comfortably inside a morning. A lot of our Hertfordshire work is commercial and residential development along that belt.

Being close means the crew that priced the job is the crew that turns up, and a problem gets looked at the same day rather than the next visit.

25 min From our yard to Watford
9 Trades we run ourselves, none subcontracted
2015 On South East sites since
100 % Own crews, own plant, own supervision
What we do here

What we take on across Hertfordshire.

One discipline or the whole substructure — the scope does not change with the postcode.

Site Preparation

Clearance, setting out and reduced-level dig to a workable platform.

Explore
Bulk Excavation

Muck shift and dig to formation under a managed haulage plan.

Explore
Foundations

Strip and trench-fill footings, pads, pile caps and ground beams.

Explore
RC Works & Basements

Frames, cores, retaining walls and watertight basement boxes.

Explore
Drainage

Foul and surface water runs, chambers, attenuation and connections.

Explore
Concrete Flatwork

Ground-bearing and power-floated slabs laid to tolerance.

Explore

Also delivering hard & soft landscaping, tank installation and Section 278 highway works.

See all services
How it works

Five stages, one phone number.

The same sequence on every Hertfordshire job, so you always know what happens next and who owns it.

Drawings in
Site visit
Measured price
On site
Handover
Step 1 of 5 Drawings in

Send the plans, the scope and the dates you need to hit. You get an honest answer on whether it suits us.

Step 2 of 5 Site visit

We walk it and check access, levels, ground conditions and services. Most surprises get found here rather than mid-dig.

Step 3 of 5 Measured price

A priced package with the build order set out and a start date we are willing to commit to.

Step 4 of 5 On site

Our own crews, plant and supervision, with one point of contact reporting as the works progress.

Step 5 of 5 Handover

Inspected, signed off and cleared, ready for the follow-on trades to start on programme.

Working in Hertfordshire

Clay over chalk, and plenty of live sites.

Much of the county is London Clay over chalk, which is straightforward enough once the site investigation is read, but it does mean foundation depths vary more than people expect across a single plot.

The other Hertfordshire pattern is occupation. A lot of the work is extensions and infill on sites that are still running: schools in term time, healthcare premises, and commercial buildings where the client cannot simply close.

Clay over chalk Founding depths read from the investigation, verified on site. Live and occupied sites Phasing, hoarding and access agreed before mobilisation. Building control hold points Inspections booked into the sequence, not chased after. Drainage connections Sewer approvals started early, because they set the date.
Clay over chalk, and plenty of live sites.
Our work

Recent projects.

A look at work delivered across London and the South East.

Got a project coming up?

Send us the drawings and the dates you need to hit. We’ll come back with a measured price and an honest start date.

“They priced the package, sequenced it properly, then ran it the way they said they would. We were not chasing anyone.”
James Whitmore Project Manager · main contractor
“Straight answers when things moved on site, and the programme held. Worth more than the cheapest number on the tender.”
Michael Bennett Quantity Surveyor · developer
“Site came back to us cleared and inspected, so our follow-on trades were not picking up after them.”
Daniel Foster Site Manager · construction group
Hertfordshire questions

Asked on this side of town.

If yours is not here, ring the office — it is usually a two-minute answer.

Watford and Rickmansworth are around twenty-five minutes from the yard, and St Albans and Hemel are inside the hour. Mobilisation is quick and so is a same-day visit when something changes.

Regularly. Phasing, hoarding, segregation and vetting are agreed before we mobilise, and works are sequenced around term dates or clinical activity rather than the other way round.

Yes, and we start them early. The water authority’s timescales, not the digging, are usually what decide when a connection can happen.

No. It sits inside our normal working area and is priced like a job closer to the yard. Access, ground conditions and haulage distance are what move the number.

Yes. Most of our Hertfordshire work is the whole substructure, clearance through to external works, under one contract.

Next step

Send us the drawings for your Hertfordshire site.

We will walk it, measure it up, and come back with a price and a start date we can hold.

Send us your drawings 01895 725125
No obligation Free site visit before we price Straight answer either way